Hello clean power.

Meet the MP-75, the intelligent mobile battery built to replace diesel generators.

Structural
Battery Pack

Prioritizing safety
and performance.

IoT
Connected

Realtime telematics for
intelligent insights.

SiC
Inverter

Software defined Hardware.

World-class efficiency.

Virtually Silent

Library quiet,
off-road ready.

Made in
America

Designed and manufactured in California.

MP-75 Technical Specifications

  • Continuous Power

    40 kVA @ 480V/3P

  • 35 kVA @ 208V/3P

  • 24 kVA @ 240V/1P

  • Max Power

    75 kVA @ 480V/3P

  • 35kVA @ 208V/3P

  • 24 kVA @ 240V/1P

  • Total Max Current

    300 A @ 480V/3P

  • 300 A @ 208V/3P

  • 200 A @ 240V/1P

  • Usable Energy

    550kWh

  • DC Charge Time

    13 hrs

  • Runtime @30% Load

    480V, 22.5 kVA = 24 hours

  • 208V, 10.2 kVA = 52 hours

  • 240V, 6.6 kVA = 83 hours

  • 120V, 1 kVA = 550 hours

  • Frequency

    60hz

  • Unit Dimensions

    102” x 38” x 58.5” (LxWxH)

  • Unit + Trailer

    162” x 69” x 78” (LxWxH)

  • Unit Weight

    10,600 pounds

  • Unit + Trailer

    12,000 pounds

Technical Specifications

Technical Specifications

Technical Specifications

How Energy
Services works.

  • 01.

    Schedule

    Reserve online or just give us a call.

  • 02.

    Deliver

    We'll get it where you need it, all charged up.

  • 03.

    Monitor

    Gain real-time insights from remote telematics.

  • 04.

    Swap

    We’ll make sure you never run out of power.

  • 05.

    Pickup

    We'll pick it up when your job is done.

Faq

  • How can I purchase an MP-75?

    Reach out and we’ll get you the details.

  • How can I rent from Energy Services?

    Send your info so we can keep you updated as Energy Services expands.

  • Can I run the MP-75 paired with an existing generator?

    Absolutely, powering your equipment via the MP-75 and running a generator for a few hours a day to recharge is a great way to increase efficiency and should result in fuel savings of up to 80%. It also ensures you can run your generator at peak efficiency, with all power being captured and minimal emissions due to wet stacking.

  • How long does a full charge on the MP-75 last?

    It all depends on your power needs, but one charged unit is capable of running an average American home for about a month, or a typical construction site for about a week assuming standard equipment.

  • How many times could an MP-75 charge a cell phone?

    Most phones have a battery capacity of ~2,000 mAh, which the MP-75 could charge around 96,720 times.

  • Are you going to release additional products?

    Definitely! We've got several new products in the portfolio, sign up for updates.